03 · Commercial

Commercial
& Tenders.

Government, mining, ports and infrastructure projects delivered end-to-end. Paperwork current, safety posture managed, programme kept.

$750k

Largest single engagement — Synergy Kwinana

6

Named commercial partners on file

BC104702

WA Builder Licence — current

$2M

Head contractor capacity ceiling

Sectors

Where we’re
tender-ready today.

Active WA Builder Licence (BC104702), current insurances and a documented WHS management system. Recent commercial deliveries include Synergy Kwinana ($750k), Onslow Skate Park amenities ($480k) and Shire of Ashburton staff housing ($400k).

01

Government & civic

Local and state government works — refurbs, fit-outs, staff housing and community facilities.

02

Mining & resources

Remote-site works, accommodation village upgrades, camp reinstatements.

03

Ports & infrastructure

Wharf-side builds, office fit-outs, modular office installations and operational facility upgrades.

04

Utilities

Substation works, switchyard compliance, structural concrete remediation and asset-side refurbs.

05

Commercial fit-outs

Office and retail fit-outs, shopping-centre rollouts, delivered around live trading hours.

06

Refurbishment & make-good

End-of-lease make-goods and rectification works, staged refurbishments of live assets.

Recent commercial work

Tenders delivered.
Across WA.

Six recent engagements delivered as head contractor — utilities, retail rollouts and government infrastructure. Project register from $25,000 reactive works to $750,000 capital programmes.

Kwinana

2025

Synergy Kwinana Powerstation

$750,000 · Concrete remediation works delivered as head contractor on a live utilities asset.

Synergy — Kwinana Powerstation

Onslow

2025

Shire of Ashburton — Onslow Skate Park

$480,000 · Renovation of Skate Park amenities — new disability bathrooms, commercial kitchen and storeroom.

Tom Price · Paraburdoo

2025

Shire of Ashburton — staff housing

$400,000 · Multi-property refurbishment programme. New roofs and internal works.

Perth Metro

2025

Tomra Depots — front-of-house

$75,000 · Face-lift programme across Tomra depot network.

Karratha

2025

Main Roads — Red Dirt Highway fly camp

$50,000 · Ausco modular office installation for Main Roads.

Tom Price

2025

Ashburton — Diamond Club rectification

$25,000 · Reactive storm-damage roof rectification, Diamond Club Tom Price.

Trusted by

Names on
the register.

Six commercial clients across utilities, government, retail networks, ports and property. Each delivered as head contractor — same builder, start to handover.

Why clients re-award

A record
of finishing.

The commercial work on file wasn’t won on price. It was won because the previous one got delivered.

Head contractor

Delivered as head contractor on engagements up to $750k — Synergy Kwinana powerstation, Onslow Skate Park, Shire of Ashburton staff housing.

Documented WHS

Documented WHS management system. SWMS issued site-by-site. Insurance and licence certificates available on request.

Single accountability

Named senior on every tender, on site, on the phone — not a project-manager pyramid.

Reporting proper

Monthly progress claims, cost reports and risk registers. Format agreed with the client up front.

Why clients re-award

A record
of finishing.

The commercial work on file wasn’t won on price. It was won because the previous one got delivered.

The commercial work on file wasn’t won on price. It was won because the previous one got delivered.

Head contractor

Delivered as head contractor on engagements up to $750k — Synergy Kwinana powerstation, Onslow Skate Park, Shire of Ashburton staff housing.

Documented WHS

Documented WHS management system. SWMS issued site-by-site. Insurance and licence certificates available on request.

Single accountability

Named senior on every tender, on site, on the phone — not a project-manager pyramid.

Reporting proper

Monthly progress claims, cost reports and risk registers. Format agreed with the client up front.

Featured engagement

Inside a $500k
multi-site rollout.

Containers for Change with WARRRL — a $500,000 RVM kiosk installation programme delivered across Perth metro shopping centres in 2024. Multi-site, in-trading, head contractor.

2024 · Perth metro · Retail rollout

WARRRL — Containers for Change.

A $500,000 RVM kiosk installation programme delivered across Perth metro shopping centres for WARRRL — operator of Western Australia’s container deposit scheme. Programme-managed across multiple live retail sites, with site-by-site coordination through centre management.

Multi-site · Retail rollout · $500k

Value

$500,000

Year

2024

Role

Head contractor

Status

Delivered

Challenge

Multi-site retail, in trading.

Container deposit infrastructure rolled out across live shopping centres, against a state scheme timeline.

· Multiple Perth metro shopping centres

· Live retail — programmed around tenants & customer flow

· Sequenced against the WARRRL state rollout

Approach

Programme-led. One number.

A single mobilised crew running site-by-site against the rollout schedule, head contractor on each centre.

· Single point of contact across the programme

· Coordination with each centre’s management

· Tomra RVM hardware integration on every site

Outcome

Network live. Re-engaged.

Programme delivered across Perth metro. Network live under Containers for Change. Tomra engagements followed.

· $500,000 programme delivered to schedule

· Reference for multi-site retail rollouts in WA

· Reference contacts available on request

Featured engagement

Inside a $500k
multi-site rollout.

Containers for Change with WARRRL — a $500,000 RVM kiosk installation programme delivered across Perth metro shopping centres in 2024. Multi-site, in-trading, head contractor.

Containers for Change with WARRRL — a $500,000 RVM kiosk installation programme delivered across Perth metro shopping centres in 2024. Multi-site, in-trading, head contractor.

2024 · Perth metro · Retail rollout

WARRRL — Containers for Change.

A $500,000 RVM kiosk installation programme delivered across Perth metro shopping centres for WARRRL — operator of Western Australia’s container deposit scheme. Programme-managed across multiple live retail sites, with site-by-site coordination through centre management.

Multi-site · Retail rollout · $500k

Value

$500,000

Year

2024

Role

Head contractor

Status

Delivered

Challenge

Multi-site retail, in trading.

Container deposit infrastructure rolled out across live shopping centres, against a state scheme timeline.

· Multiple Perth metro shopping centres

· Live retail — programmed around tenants & customer flow

· Sequenced against the WARRRL state rollout

Approach

Programme-led. One number.

A single mobilised crew running site-by-site against the rollout schedule, head contractor on each centre.

· Single point of contact across the programme

· Coordination with each centre’s management

· Tomra RVM hardware integration on every site

Outcome

Network live. Re-engaged.

Programme delivered across Perth metro. Network live under Containers for Change. Tomra engagements followed.

· $500,000 programme delivered to schedule

· Reference for multi-site retail rollouts in WA

· Reference contacts available on request

Coverage

Tenders won
across WA.

Commercial delivery footprint runs from the Perth metro area north through to Onslow, Tom Price, Paraburdoo and Karratha. Mobilised against scheduled regional trips so capital tenders aren’t paying solo van runs.

Insurance, licence and capability pack available within 48 hours of EOI receipt.

Metro

Perth metro.

Synergy · WARRRL · Tomra

Pilbara

Onslow · Tom Price · Paraburdoo

Shire of Ashburton

Pilbara

Karratha

Main Roads — fly camp install

South West

Boddington · Bridgetown

Available on scheduled trips

Brief us

Tell us about the tender.

Send through the EOI, RFQ or scope and we’ll come back inside 48 hours with capability confirmation, indicative pricing posture and any clarifying questions.

Direct line · owner-operator

Mon–Sat · 7am–6pm AWST

Reactive IFM · 24/7

After Hours

Same number · escalation queue

Email · brief direct

Reply within 1 business day

Common questions

Frequently
asked.

What procurement teams need on file before they shortlist us. Compliance posture, capability statement, references — all current.

We hold an active WA Builder Licence (BC104702) and have delivered head-contractor work for the Shire of Ashburton, Synergy and WARRRL. Specific buying-panel pre-qualifications confirmed on request — our team can respond to an EOI inside 48 hours and supply a full capability pack on request.

Documented WHS management system. Site-specific SWMS issued for every project. Insurance and licence certificates available on request — including public liability, workers’ comp and Home Indemnity. Incident, hazard and near-miss reporting through a single portal — included in your monthly report.

Yes. Active references include Tomra Collective AU, Lease Equity, Shire of Ashburton and Macmahon Services. Capability statement covers insurances, licences, project register and key personnel — request a copy via the contact form.

Recent commercial engagements have run from $25,000 (storm rectification) to $750,000 (Synergy Kwinana concrete remediation). We’re scoped for projects up to $2M as head contractor, with larger packages delivered through joint venture.

Most of our commercial work is live-site — wharf offices, civic facilities, switchyards and shopping centres. We stage works around your operational schedule, not the other way around. Zero operational disruption is the bar, not the goal.

Monthly progress claims with line-item cost reports, programme update, risk register and photo log. Format aligned to AS 4000 / AS 2124 standard. Variations quoted, signed and logged in writing — never verbal.

Common questions

Frequently
asked.

What procurement teams need on file before they shortlist us. Compliance posture, capability statement, references — all current.

What procurement teams need on file before they shortlist us. Compliance posture, capability statement, references — all current.

We hold an active WA Builder Licence (BC104702) and have delivered head-contractor work for the Shire of Ashburton, Synergy and WARRRL. Specific buying-panel pre-qualifications confirmed on request — our team can respond to an EOI inside 48 hours and supply a full capability pack on request.

Documented WHS management system. Site-specific SWMS issued for every project. Insurance and licence certificates available on request — including public liability, workers’ comp and Home Indemnity. Incident, hazard and near-miss reporting through a single portal — included in your monthly report.

Yes. Active references include Tomra Collective AU, Lease Equity, Shire of Ashburton and Macmahon Services. Capability statement covers insurances, licences, project register and key personnel — request a copy via the contact form.

Recent commercial engagements have run from $25,000 (storm rectification) to $750,000 (Synergy Kwinana concrete remediation). We’re scoped for projects up to $2M as head contractor, with larger packages delivered through joint venture.

Most of our commercial work is live-site — wharf offices, civic facilities, switchyards and shopping centres. We stage works around your operational schedule, not the other way around. Zero operational disruption is the bar, not the goal.

Monthly progress claims with line-item cost reports, programme update, risk register and photo log. Format aligned to AS 4000 / AS 2124 standard. Variations quoted, signed and logged in writing — never verbal.