Commercial Construction Perth · Civil & Infrastructure

Commercial Construction
Perth.

Commercial construction Perth-wide since 2023 — government tenders, civil works, industrial fitouts and infrastructure delivered for Synergy, WARRRL, Shire of Ashburton, Tomra Collective AU, Lease Equity and Pilbara Ports. WA Builder BC104702, public liability and works cover current, references on request.

2023

Trading since — WA construction company

BC104702

WA Builder Licence — current

$7.5K–$300K+

Project range delivered to date

12mo

Direct aftercare on every job

What we deliver

Four pillars of
commercial construction Perth-wide.

From a $15K cooling-tower refit to a $750K utility project. Government tenders, civil and infrastructure, commercial fitouts, industrial works — one WA-licensed builder runs the lot, in our name, on our insurance.

01 · Tenders

Government & public sector.

Tender responses for Synergy, Shire of Ashburton, Pilbara Ports, Main Roads. Compliant submissions, public liability cover, WHS frameworks.

02 · Civil & infrastructure

Roads, services, structures.

Public infrastructure works — skate parks, transit housing, services upgrades. Recent work for Shire of Ashburton, Main Roads, Pilbara Ports.

03 · Industrial

Fitouts & refurbishments.

Industrial fitouts and depot works — Tomra Collective AU, WARRRL, Synergy Kwinana. Sites operational during build where possible.

04 · Commercial

Office & retail.

Office, retail and tenant fitouts for property managers — recent work for Lease Equity. Defects-led handovers, tenancy-ready certificates.

What we deliver

Four pillars of
commercial construction Perth-wide.

From a $15K cooling-tower refit to a $750K utility project. Government tenders, civil and infrastructure, commercial fitouts, industrial works — one WA-licensed builder runs the lot, in our name, on our insurance.

01 · Tenders

Government & public sector.

Tender responses for Synergy, Shire of Ashburton, Pilbara Ports, Main Roads. Compliant submissions, public liability cover, WHS frameworks.

02 · Civil & infrastructure

Roads, services, structures.

Public infrastructure works — skate parks, transit housing, services upgrades. Recent work for Shire of Ashburton, Main Roads, Pilbara Ports.

03 · Industrial

Fitouts & refurbishments.

Industrial fitouts and depot works — Tomra Collective AU, WARRRL, Synergy Kwinana. Sites operational during build where possible.

04 · Commercial

Office & retail.

Office, retail and tenant fitouts for property managers — recent work for Lease Equity. Defects-led handovers, tenancy-ready certificates.

Featured commercial

A $750K Synergy
delivery in
Kwinana.

A commercial construction Perth project delivered for Synergy — Western Australia’s state-owned utility. Multi-trade scope, operational site constraints, programme to a hard handover date.

Synergy · Kwinana · WA government utility

Synergy — Kwinana works.

A $750,000 commercial construction package delivered for Synergy at their Kwinana facility. Multi-trade scope, operational-site constraints, programme to a fixed handover. Tendered competitively, contracted in our name as the licensed builder.

Value

$750,000

Client

Synergy

Role

Head builder

YEAR

2024

Featured commercial

A $750K Synergy
delivery in
Kwinana.

A commercial construction Perth project delivered for Synergy — Western Australia’s state-owned utility. Multi-trade scope, operational site constraints, programme to a hard handover date.

Synergy · Kwinana · WA government utility

Synergy — Kwinana works.

A $750,000 commercial construction package delivered for Synergy at their Kwinana facility. Multi-trade scope, operational-site constraints, programme to a fixed handover. Tendered competitively, contracted in our name as the licensed builder.

Value

$750,000

Client

Synergy

Role

Head builder

YEAR

2024

Why us

Why Perth clients
brief us — among
construction
companies Perth
offers.

Four practical reasons procurement teams pick GPD for commercial work. The unglamorous things that decide whether a tender response gets shortlisted or filed.

01

A WA licensed builder.

BC104702 active since 2023. ABN 22 668 388 056. Public liability and contract works cover current. Certificates supplied with every tender response.

02

Real references on file.

Synergy, WARRRL, Pilbara Ports, Lease Equity, Shire of Ashburton. References — S. Blechynden (Tomra), A. Sertorio (Lease Equity), G. Atkens (Macmahon).

03

Direct line to the builder.

Owner-operated. The builder reads every tender, signs every contract, runs every project meeting. No project manager filtering questions to head office.

04

Pilbara to Perth metro.

Recent commercial work delivered in Kwinana, Onslow, Karratha, Tom Price, Paraburdoo and Boddington. Crews mobilised to remote WA — not just metro.

Recent commercial

Recent commercial construction Perth deliveries.

Four recent commercial projects from the GPD register — values $400K to $750K, delivered for WA government, utilities and waste-management clients. Reference contacts available on request.

2024 · Kwinana · Synergy

2024

Synergy — Kwinana.

Multi-trade commercial construction for WA’s state utility. Hard handover, operational site constraints. $750,000

Synergy — Kwinana Powerstation

Perth metro · WARRRL

2024

WARRRL Containers for Change.

Industrial works for the WA container deposit scheme operator — capacity build-out across multiple sites. $500,000

Onslow · Shire of Ashburton

2023

Onslow Skate Park.

Public-realm civil construction for the Shire of Ashburton — concrete civil works, public-park furniture, council-handover scope. $480,000

Tom Price · Shire of Ashburton

2023

Ashburton staff housing.

Government staff-housing works in Tom Price and Paraburdoo — remote Pilbara mobilisation, multi-residence scope. $400,000

How we work

Four steps from
tender to handover.

Same runbook for a $50,000 facilities upgrade and a $750,000 multi-trade build — only the duration changes. Every commercial construction Perth project we run follows the same four steps.

Tender / brief

Tender response or direct brief — client’s choice. Questions answered by the builder, not a sales rep. Insurance and licence packs on request.

Scope & contract

Written scope, lump-sum or schedule-of-rates contract, programme in calendar weeks. Variations by signed instruction. Insurance and WHS filed pre-mobilisation.

Build & report

Programme tracked in calendar weeks. Weekly project reports — progress, claims, variations, programme. Bad news same day as good news, no quarter-end surprises.

Handover & defects

Defects closed pre-handover. As-built documents, certificates and warranties filed at completion. Defects liability period as contracted, no exceptions.

How we work

Four steps from
tender to handover.

Same runbook for a $50,000 facilities upgrade and a $750,000 multi-trade build — only the duration changes. Every commercial construction Perth project we run follows the same four steps.

Tender / brief

Tender response or direct brief — client’s choice. Questions answered by the builder, not a sales rep. Insurance and licence packs on request.

Scope & contract

Written scope, lump-sum or schedule-of-rates contract, programme in weeks. Variations by signed instruction. Insurance and WHS pre-filed.

Build & report

Programme tracked in calendar weeks. Weekly reports — progress, claims, variations. Bad news same day, no quarter-end surprises.

Handover & defects

Defects closed pre-handover. As-builts, certificates and warranties filed at completion. Liability period as contracted, no exceptions.

Quality criteria

What separates civil contractors Perth
can rely on.

The unglamorous things commercial procurement teams check before shortlisting. None of these show in glossy capability statements. All of them matter when something goes wrong on site.

Insurance

Public liability & works cover.

Public liability and contract-works insurance current and in our name. Certificates of currency supplied with every tender response — not “available on request” stalling.

WHS

Plans on file, not in slides.

Documented WHS plans, JSAs and SWMS for the actual work — not generic templates. Site-specific risk assessment before mobilisation, not after the first incident.

Licence

In the builder’s name.

Building licence BC104702 active and in our name — not a head-contractor’s borrowed licence with subcontracted delivery. Liability flows with the licence.

References

Named contacts. Pick up the phone.

Stephen Blechynden (Tomra), Albert Sertorio (Lease Equity), Glenn Atkens (Macmahon), Shire of Ashburton procurement. References who’ll answer a phone call about us.

Reporting

Weekly. To programme.

Weekly project reports — progress, programme, variations, claims, RFIs. Bad news same day. Procurement teams hate Friday-afternoon surprises.

Mobility

Pilbara to Perth metro.

Recent works delivered in Kwinana, Onslow, Karratha, Tom Price, Paraburdoo, Boddington and across Perth metro. Remote-WA mobilisation isn’t an exception for us.

Quality criteria

What separates civil contractors Perth
can rely on.

The unglamorous things commercial procurement teams check before shortlisting. None of these show in glossy capability statements. All of them matter when something goes wrong on site.

The unglamorous things commercial procurement teams check before shortlisting. None of these show in glossy capability statements. All of them matter when something goes wrong on site.

Insurance

Public liability & works cover.

Public liability and contract-works insurance current and in our name. Certificates of currency supplied with every tender response — not “available on request” stalling.

WHS

Plans on file, not in slides.

Documented WHS plans, JSAs and SWMS for the actual work — not generic templates. Site-specific risk assessment before mobilisation, not after the first incident.

Licence

In the builder’s name.

Building licence BC104702 active and in our name — not a head-contractor’s borrowed licence with subcontracted delivery. Liability flows with the licence.

References

Named contacts. Pick up the phone.

Stephen Blechynden (Tomra), Albert Sertorio (Lease Equity), Glenn Atkens (Macmahon), Shire of Ashburton procurement. References who’ll answer a phone call about us.

Reporting

Weekly. To programme.

Weekly project reports — progress, programme, variations, claims, RFIs. Bad news same day. Procurement teams hate Friday-afternoon surprises.

Mobility

Pilbara to Perth metro.

Recent works delivered in Kwinana, Onslow, Karratha, Tom Price, Paraburdoo, Boddington and across Perth metro. Remote-WA mobilisation isn’t an exception for us.

07 · Trusted by

A short list of
WA commercial
partners.

Six named commercial clients on the books. Government, utility, civil, waste-management, property and ports — references available on request.

Brief us on a project

Tell us about your Perth commercial project.

A short brief so we can come back with an informed first call. The builder reads every tender brief personally — replies within one business day.

Direct line · owner-operator

Mon–Sat · 7am–6pm AWST

Reactive IFM · 24/7

After Hours

Same number · escalation queue

Email · brief direct

Reply within 1 business day

Common questions

Commercial
construction
Perth — the
questions we get.

Procurement and project-management questions we get from commercial clients before the first meeting. Plain answers, plain English.

01 What’s your maximum project value?Our largest commercial delivery to date is $750,000 (Synergy, Kwinana). We’re scaled appropriately for $50,000 to $1,000,000 commercial scopes — single-builder oversight, direct programme control, no head-office filtering. Above that range we’d partner with a head contractor.

Yes. We’ve tendered and delivered for Synergy, Shire of Ashburton, WARRRL, Pilbara Ports and Main Roads. Insurance certificates, licence packs, WHS frameworks and capability statements supplied with every tender response — no follow-up admin chase needed.

Yes. Recent works in Kwinana, Onslow, Karratha, Tom Price, Paraburdoo, Boddington. We mobilise crews to remote WA — Pilbara, Goldfields, mid-west — at scope. Travel and accommodation costed transparently in the tender, not buried in variation claims later.

Owner-operated. The builder reads every tender brief personally, signs every contract, runs every project meeting. No project-manager intermediary, no head-office bottleneck. You speak directly to the person who’s accountable for delivery.

Yes — named contacts on file. Stephen Blechynden (Tomra Collective AU), Albert Sertorio (Lease Equity), Glenn Atkens (Macmahon), Shire of Ashburton procurement. We’ll provide direct reference contacts at tender stage, not “available on request” stalling.

Most construction companies Perth-wide at our scale operate as managed marketplaces — you get a project manager who coordinates subcontractors. GPD is owner-operated: a single WA-licensed builder runs every job from tender to handover, in our name, on our insurance. Smaller team, fewer layers, direct accountability.