Maintenance.

Planned and reactive maintenance with a dedicated service team. One call handles electrical, mechanical, fire, plumbing and compliance testing across your portfolio.

$750k

Largest single engagement — Synergy Kwinana

WA

Coverage — Perth metro to Pilbara

BC104702

WA Builder Licence — current

2023

Trading as GPD Group

Scope

What the
service team covers.

Run as a single contract across every trade on your site. The admin, the reporting, the compliance — we own the lot so your facilities manager doesn’t.

01

Planned preventative maintenance

Scheduled PPM programmes with asset registers, frequency matrices and quarterly reporting.

02

Reactive & emergency

After-hours dispatch for urgent faults. Direct line to the team — not a call centre.

03

Electrical & mechanical

Licensed electrical through our trade panel — plus HVAC, refrigeration, and mechanical.

04

Fire & essential services

Annual Fire Safety Statements, extinguisher servicing, detector and panel testing.

05

Testing & compliance

Test & tag, RCD testing, thermographic scans, emergency lighting and exit sign logs.

06

Minor works & fit-outs

In-flight minor works — partition changes, make-goods, and reinstatements.

Recent facilities work

Inside portfolios.
Across WA.

Recent work delivered as head contractor inside facilities portfolios — utilities, retail networks and government staff housing. From single rectifications to multi-site rollouts.

Perth metro

2024

Containers for Change — WARRRL

$500,000 · RVM kiosk rollout across Perth metro shopping centres.

Tom Price · Paraburdoo

2025

Shire of Ashburton — staff housing

$400,000 · Multi-property refurbishment programme. New roofs and internal works.

Perth metro

2025

Tomra Depots — front-of-house

$75,000 · Face-lift programme across Tomra depot network. Customer-experience focus.

Onslow

2025

Sun Chalets — bathroom refurbishment

$60,000 · Two-bathroom refurbishment programme at Sun Chalets Park, Onslow.

Tom Price

2025

Ashburton — storm damage rectification

$60,000 · Reactive replacement of storm-damaged Colorbond fencing across staff housing.

Madeley

2025

Kingsway City — cooling towers

$15,000 · Repairs to shopping-centre cooling towers. Discreet, in-trading delivery.

Trusted by

Names on
the register.

Six commercial clients across utilities, government, retail networks, ports and property. Each delivered as head contractor — same builder, start to handover.

Engagement models

Three honest
ways to engage us.

No tiered SLA marketing. Pick the contract shape that suits your portfolio. We’ll happily run two in parallel — a PPM contract on the high-frequency sites and project-basis on the rest.

01

PPM contract

A fixed scope of planned preventative maintenance across your portfolio, priced annually with quarterly reviews. Asset register, frequency matrix and reporting included.

Best for portfolios of 3+ sites where compliance and consistency matter.

02

Reactive on call

A standing arrangement to take your reactive work — break-fix, after-hours, make-goods. Priced per ticket, with agreed response windows that match the site, not a generic SLA.

Best for portfolios with an existing PPM provider where you need a reactive partner.

03

Project basis

Discrete works inside your facilities portfolio — refurbishments, fit-outs, rectification programmes, rollouts. Quoted as a fixed lump-sum per project, delivered as head contractor.

Best for one-off capital works inside a managed facilities portfolio.

Engagement models

Three honest
ways to engage us.

No tiered SLA marketing. Pick the contract shape that suits your portfolio. We’ll happily run two in parallel — a PPM contract on the high-frequency sites and project-basis on the rest.

01

PPM contract

A fixed scope of planned preventative maintenance across your portfolio, priced annually with quarterly reviews. Asset register, frequency matrix and reporting included.

Best for portfolios of 3+ sites where compliance and consistency matter.

02

Reactive on call

A standing arrangement to take your reactive work — break-fix, after-hours, make-goods. Priced per ticket, with agreed response windows that match the site, not a generic SLA.

Best for portfolios with an existing PPM provider where you need a reactive partner.

03

Project basis

Discrete works inside your facilities portfolio — refurbishments, fit-outs, rectification programmes, rollouts. Quoted as a fixed lump-sum per project, delivered as head contractor.

Best for one-off capital works inside a managed facilities portfolio.

Onboarding

From walkthrough
to on-call, in a
programme.

Onboarding shouldn’t drag on. We run a condition walk, scope the PPM matrix, agree the reactive framework with you in writing, and go live on a programme that suits your portfolio — not a generic template.

Walkthrough

Site-by-site condition assessment. Asset register pulled together live.

PPM plan

Frequency matrix, response windows and budget — in writing before any van rolls.

Go live

Reactive line activated. First PPM cycle begins. Monthly reporting from day one.

Quarterly review

Face-to-face review of works, trends, incidents and next-quarter scope.

Onboarding

From walkthrough
to on-call, in a
programme.

Onboarding shouldn’t drag on. We run a condition walk, scope the PPM matrix, agree the reactive framework with you in writing, and go live on a programme that suits your portfolio — not a generic template.

Onboarding shouldn’t drag on. We run a condition walk, scope the PPM matrix, agree the reactive framework with you in writing, and go live on a programme that suits your portfolio — not a generic template.

Walkthrough

Site-by-site condition assessment. Asset register pulled together live.

PPM plan

Frequency matrix, response windows and budget — in writing before any van rolls.

Go live

Reactive line activated. First PPM cycle begins. Monthly reporting from day one.

Quarterly review

Face-to-face review of works, trends, incidents and next-quarter scope.

Featured engagement

Inside a $750k
utilities engagement.

Synergy Kwinana — concrete remediation works delivered as head contractor in 2025. The largest single engagement on our register, and the kind of job that decides whether a builder gets called back for the next one.

Synergy — Kwinana Powerstation

2025 · Kwinana · Utilities

Synergy —
Kwinana
Powerstation.

Concrete remediation works at the Synergy Kwinana power station — a structural rectification programme inside a live utilities portfolio. Compliance, plant access and safety controls aligned to the asset’s operational standards throughout the engagement.

Value

$750,000

Year

2025

Role

Head contractor

Status

Delivered

Concrete remedial · Utilities · $750k · Head contractor

Challenge

An operating utility, on its own clock.

A live power generation site set the rhythm of every work front.

· Plant operations dictated working windows

· Utilities-grade safety and access permits

· Exclusion zones live across the programme

Approach

Builder-led. One number.

Self-performed structural works, co-ordinated by the builder running the job.

· Regular trade panel for adjacent disciplines

· One contact from quote to handover

· Monthly progress and cost reporting

Outcome

Delivered. Reference job.

Largest engagement on the GPD register. Delivered to standard.

· $750,000 of structural concrete remediation

· Working reference for live-asset works in WA

· Reference contacts available on request

Featured engagement

Inside a $750k
utilities engagement.

Synergy Kwinana — concrete remediation works delivered as head contractor in 2025. The largest single engagement on our register, and the kind of job that decides whether a builder gets called back for the next one.

Synergy Kwinana — concrete remediation works delivered as head contractor in 2025. The largest single engagement on our register, and the kind of job that decides whether a builder gets called back for the next one.

Synergy — Kwinana Powerstation

2025 · Kwinana · Utilities

Synergy —
Kwinana
Powerstation.

Concrete remediation works at the Synergy Kwinana power station — a structural rectification programme inside a live utilities portfolio. Compliance, plant access and safety controls aligned to the asset’s operational standards throughout the engagement.

Value

$750,000

Year

2025

Role

Head contractor

Status

Delivered

Concrete remedial · Utilities · $750k · Head contractor

Challenge

An operating utility, on its own clock.

A live power generation site set the rhythm of every work front.

· Plant operations dictated working windows

· Utilities-grade safety and access permits

· Exclusion zones live across the programme

Approach

Builder-led. One number.

Self-performed structural works, co-ordinated by the builder running the job.

· Regular trade panel for adjacent disciplines

· One contact from quote to handover

· Monthly progress and cost reporting

Outcome

Delivered. Reference job.

Largest engagement on the GPD register. Delivered to standard.

· $750,000 of structural concrete remediation

· Working reference for live-asset works in WA

· Reference contacts available on request

Coverage

Perth metro
to the Pilbara.

Most facilities work runs across the Perth metro area, but our delivery footprint stretches north to Onslow, Tom Price, Paraburdoo and Karratha. Regional and remote sites are mobilised against scheduled trips so you’re not paying for solo van runs.

After-hours: a direct number to the team. Not a call centre, not a queue.

Metro

Perth metro.

Standard PPM & reactive

Pilbara

Onslow · Tom Price · Paraburdoo

Active w/ Ashburton

Pilbara

Karratha

Red Dirt fly camp

Regional

Boddington · Bridgetown

Scheduled trips

Brief us

Tell us about your portfolio.

A site walkthrough is the cheapest part of switching maintenance providers. We’ll come and look, then come back with a written assessment and an indicative model — usually inside two weeks.

Direct line · owner-operator

Mon–Sat · 7am–6pm AWST

Reactive IFM · 24/7

After Hours

Same number · escalation queue

Email · brief direct

Reply within 1 business day

Common questions

Frequently
asked.

What facilities managers want to know before they hand over a portfolio. Direct answers, current pricing posture, real coverage.

Response windows are agreed in writing per contract — not a one-size promise. Metro, regional and remote sites get scoped windows that match the asset and the risk. We don’t quote times we can’t keep. Every reactive job is logged, attended and reported.

Both, transparently. Carpentry, fit-out and minor works are self-performed. Electrical, mechanical, fire and plumbing run through a regular panel of WA-licensed trades we’ve worked with for years. You see the same faces.

Onboarding is shaped around your portfolio — not a fixed template. We do a condition walkthrough, build the asset register and PPM matrix, agree the framework in writing, then go live. Larger or remote portfolios run 2–3 weeks. You’ll see a written onboarding plan before we start.

Monthly written report covering PPM completion, reactive ticket volume and resolution times, compliance status (fire, RCDs, test & tag), incidents, and next-month forecast. Quarterly face-to-face review on top.

Yes. Annual Fire Safety Statements, RCD testing, test & tag, emergency lighting and exit sign logs, thermographic scans. We carry the certificates and the panel that signs them off — you don’t manage three vendors for one report.

Yes — Perth metro through to Onslow, Tom Price, Paraburdoo and Karratha. We’ve delivered both works and rectification programmes across the Pilbara. Regional jobs are mobilised against scheduled trips so we’re not invoicing solo van runs.

Common questions

Frequently
asked.

What facilities managers want to know before they hand over a portfolio. Direct answers, current pricing posture, real coverage.

What facilities managers want to know before they hand over a portfolio. Direct answers, current pricing posture, real coverage.

Response windows are agreed in writing per contract — not a one-size promise. Metro, regional and remote sites get scoped windows that match the asset and the risk. We don’t quote times we can’t keep. Every reactive job is logged, attended and reported.

Both, transparently. Carpentry, fit-out and minor works are self-performed. Electrical, mechanical, fire and plumbing run through a regular panel of WA-licensed trades we’ve worked with for years. You see the same faces.

Onboarding is shaped around your portfolio — not a fixed template. We do a condition walkthrough, build the asset register and PPM matrix, agree the framework in writing, then go live. Larger or remote portfolios run 2–3 weeks. You’ll see a written onboarding plan before we start.

Monthly written report covering PPM completion, reactive ticket volume and resolution times, compliance status (fire, RCDs, test & tag), incidents, and next-month forecast. Quarterly face-to-face review on top.

Yes. Annual Fire Safety Statements, RCD testing, test & tag, emergency lighting and exit sign logs, thermographic scans. We carry the certificates and the panel that signs them off — you don’t manage three vendors for one report.

Yes — Perth metro through to Onslow, Tom Price, Paraburdoo and Karratha. We’ve delivered both works and rectification programmes across the Pilbara. Regional jobs are mobilised against scheduled trips so we’re not invoicing solo van runs.