Decks, built by
the builder who quoted them.

Plenty of deck builders Perth-wide are booking someone else’s carpenter and adding a margin. Carpentry is the trade GPD self-performs. Hardwood, composite and modified timber, with the substructure sized properly underneath and the licence in the builder’s own name.

Deck Builders Perth

$7.5K–$27K

Recent deck and patio builds

1–2 wks

On site for a standard deck

AS 1684

Substructure to carpentry standard

12 mo

Direct aftercare, every job

Scope

Deck builders Perth: what we build.

Carpentry, fit-out and minor works are self-performed rather than sub-let, so timber is core business rather than something bought in. The honest question on material is not which is best, it is how much maintenance you will realistically do once the novelty wears off.

Hardwood

Jarrah, Spotted Gum and Merbau Decking

The natural look most people picture, and it ages into something better rather than worse. Wants oiling once a year to hold its colour.

Board layout set out before fixing · Hidden or plug-fixed to your preference · Oiled at handover, ready to use

Composite

Low Maintenance Composite Decking

No oiling, wash it and leave it. Worth knowing it warms up underfoot through a WA summer, which matters on a west-facing deck with no shade over it.

Concealed clip fixing systems · Expansion gaps set for WA heat · Colour and profile chosen at brief

Modified timber

Modified Timber Decking

Accoya and equivalents. Long service life and dimensionally stable, meaning less cupping and movement over the years. Premium price for it.

Stable underfoot in wide boards · Suits exposed and coastal blocks · Priced as a lump sum, not a guess

Combined

Deck and Pergola Construction

Deck with an open-roof or louvre-roof structure over it, in timber, steel or aluminium. Adding a roof changes the wind engineering and the approval path.

Framed now for a roof added later · Engineered to the block’s wind rating · Tied into paving, lawn or existing slab

Substructure

Footings, Bearers and Joists

The part that decides whether the deck is still sound in fifteen years, and the part that disappears first from a quote that needs to look cheaper.

Spans worked back from the actual load · Treated to H3 minimum, stainless fixings · Stirrup posts into footings dug to depth

Brief us

Want it finished for summer?

The approval lead time decides that, not the build. A site visit costs you an hour and commits you to nothing. We look, then come back in writing with what we would change and what it would run.

How the build runs

From site visit to handover.

Most deck builders Perth-wide quote a job and hand it to somebody else. Here it is the same runbook for a $7,500 deck and a $27,000 roofed patio, and only the duration changes.

Site visit

Free across the Perth metro. We walk the space, measure, check the ground and talk through material, layout and whether approval is needed.

Fixed price

Written line-item scope with material allowances in dollars. Engineered plans and council lodgement where required, adding four to eight weeks.

Build

One to two weeks on site for a standard deck. Weekly photo updates from the builder. Bad news arrives the same day as good news.

Handover

Defects closed before handover rather than listed after it, then twelve months of direct aftercare on every job we finish.

How the build runs

From site visit to handover.

Most deck builders Perth-wide quote a job and hand it to somebody else. Here it is the same runbook for a $7,500 deck and a $27,000 roofed patio, and only the duration changes.

Site visit

Free across the Perth metro. We walk the space, measure, check the ground and talk through material, layout and whether approval is needed.

Fixed price

Written line-item scope with material allowances in dollars. Engineered plans and council lodgement where required, adding four to eight weeks.

Build

One to two weeks on site for a standard deck. Weekly photo updates from the builder. Bad news arrives the same day as good news.

Handover

Defects closed before handover rather than listed after it, then twelve months of direct aftercare on every job we finish.

Under the boards

Decks fail from underneath.

Not from the top down. They fail where nobody looks, and by the time the symptom reaches the surface the repair costs more than the original build. This is also the only reliable way to separate deck builders Perth-wide when two prices look the same. Four things decide it, and all four are settled before a single board is laid.

Members sized to the load
Bearer and joist spans worked back from what the deck will actually carry, to AS 1684. Not copied from whatever was there before.

Treatment to H3 minimum
Everything exposed or near ground contact treated to the right hazard class. Untreated substructure is a five-year decision dressed up as a saving.

Footings dug to depth
Stirrup posts set into concrete footings at the depth the soil type requires, not surface-fixed. Cut this and the post lifts within a few WA summers.

Fixings that survive the coast
Stainless or galvanised throughout. Coastal Perth eats plain steel, and fixings are a fraction of the cost while being first to let go.

Deck Builders Perth

Recent work · Decks & patios

Decks we have already built.

Three builds off the project register with real values and real suburbs. Fixed-price contracts against a signed scope, not a rate per square metre applied to a photo. References available on request.

Residential Bayswater

2024

Bayswater hardwood deck

$7,500 · Hardwood deck delivered to a residential home in Bayswater. The lower end of what a properly built deck costs.

Timber steps leading to a deck beside a house

Residential Mt Lawley

2024

Mt Lawley hardwood deck

$12,000 · Hardwood deck integrated with the existing dwelling. Tying into an existing structure is what moves a deck up a band.

Timber decking around a backyard swimming pool

Residential North Beach

2024

North Beach outdoor patio

$27,000 · Roofed outdoor patio engineered for coastal wind exposure. Adding a roof changes the engineering and the approval path.

Metal roof flashing beside a wall

Coverage

Deck builders Perth, metro and regional.

Site visits are free across the Perth metro area. The licence travels beyond it, and regional work is grouped against trips already on the calendar rather than dispatched one van at a time.

Metro

Perth metro

Free site visits

Coastal

North Beach & coast

Wind rating, stainless fixings

Inner

Mt Lawley · Bayswater

Recent hardwood decks

Regional

South West · Pilbara

On planned runs

Coverage

Deck builders Perth, metro and regional.

Site visits are free across the Perth metro area. The licence travels beyond it, and regional work is grouped against trips already on the calendar rather than dispatched one van at a time.

Metro

Perth metro

Free site visits

Coastal

North Beach & coast

Wind rating, stainless fixings

Inner

Mt Lawley · Bayswater

Recent hardwood decks

Regional

South West · Pilbara

On planned runs

Brief us

Tell us about your backyard.

Comparing deck builders in Perth? No gatekeepers, no call centre. The builder reads every brief himself and replies within one business day, including the honest version where the budget and the block do not agree.

Direct line · owner-operator

Mon–Sat · 7am–6pm AWST

Reactive IFM · 24/7

After Hours

Same number · escalation queue

Email · brief direct

Reply within 1 business day

Common questions

Deck builders Perth: the questions we get.

What homeowners ask deck builders in Perth on a first call, answered straight. No invented numbers and no promises we cannot keep.

We build it. Carpentry, fit-out and minor works are the trades GPD self-performs, which is the whole reason this page exists. Where a job needs electrical or plumbing, those go to a standing panel of licensed WA trades and we say so plainly rather than implying one company holds every ticket.

Ask both for the substructure specification in writing: bearer and joist sizing, treatment level, footing depth and fixing type. Ask for the material allowance as a dollar figure rather than a description. Two quotes a few thousand apart are almost always different builds underneath, and that gap is where the difference sits.

Recent hardwood decks off our register have run $7,500 and $12,000, with a roofed patio at $27,000. Three things move a price more than floor area: whether the deck is freestanding or tied into the house, how far off level the ground is, and whether a roof is involved. A sloping block can cost more in footings and framing than the boards on top of it, which is why nobody can quote your deck honestly over the phone.

Most attached decks do. Freestanding structures under the threshold often do not. We assess which applies at the brief stage and lodge the application ourselves as the licensed builder, because liability for compliance travels with the licence. When a supplier hands you the forms to lodge in your own name, that liability lands on you.

One to two weeks on site for a standard deck. Where engineered plans and council approval are required, add four to eight weeks before site work starts. If you want it finished for summer, that approval lead time is the part that decides it, so a spring start is already tight.

WA Builder Licence BC104702, ABN 22 668 388 056, with public liability and workers’ compensation current. Statutory home warranty under the WA Home Building Act applies on residential work over $20,000. Certificates on request.